The Hartford completed workplace in Hyderabad

ZX Capture project experience · Hyderabad

Four months.
Two floors.
One continuous record.

1,60,000 sq ft32 progress capturesOctober 2025–February 2026
Watch the project film

The assignment

Make a fast-moving workplace easy to revisit.

ZX Capture returned to Levels 20 and 21 through sixteen capture cycles. Each visit added a dated, navigable view of the project rather than another disconnected folder of site photographs.

The record now moves from construction progress to completed workplace: floor-by-floor tours, a combined model, a three-stage comparison and a concise architectural film.

The documentation arc

Return to the same place. See what changed.

Three moments frame a longer sequence of recurring captures across both floors.

  1. 01

    The recurring record begins

    ZX Capture starts revisiting Levels 20 and 21, building a navigable reference around the same workplace as work advances.

  2. 02

    Change becomes comparable

    The middle-stage record lets teams return to rooms and routes in context, while the three-stage viewer brings selected moments together.

  3. 03

    The completed workplace

    Separate final tours document each level. A combined model, architectural film and completed-space story bring the programme to a clear close.

Move through the record

Choose a floor, both levels or the comparison.

Each destination opens as a browser-based 3D record.

Two ways to tell the story

One record. Two distinct editions.

This ZX-owned edition focuses on the capture method and the value of a continuous workplace record.

The separate client-branded edition gives Vestian and The Hartford greater prominence for their own project showcasing.

Document the full programme

Build one useful record from repeated visits.

Confirm the floors, cadence, repeat viewpoints and final delivery format.